What Storm Damage Repair Involves, Step by Step
Storm damage repair starts with stopping the water. We tarp the affected slope, clear debris out of the valleys, and check whether the ice-and-water shield actually held. Then the structural work begins, in the same order on every rooftop.
- Emergency tarping and debris removal happen the day you call, so the ceiling stops dripping while we schedule the crew.
- A rapid roof inspection checks the ridge, ridge cap, drip edge, and every penetration before we quote a number.
- Replacement shingles get matched to your existing field course, or we say plainly why a patch will look wrong on a steep pitch.
- Wet underlayment and ice-and-water shield come out rather than getting covered over, because new shingle on saturated felt invites rot.
- Soft decking gets cut back to solid wood, then plywood or OSB sheathing is fastened to the nearest rafter or truss.
- Step flashing at sidewalls, chimney flashing, apron flashing, and counter-flashing are rebuilt with new metal, caulk, and sealant.
- Gutters, downspouts, fascia, and soffit are rehung wherever wind pulled them off the roofline.
Site setup matters as much as the shingles, and poor access is why some low quotes still leak when the job is done.
- Scaffold and ladder placement go up first, with a safety harness clipped on anything above a single story.
- A roofing shovel and pry bar lift the old courses, while a nail gun and air compressor speed the reshingle once decking is sound.
- Ring-shank nails and the correct fastener length hold a course against wind uplift; overdriven nails and short screws do not.
- Adhesive, roof cement, and mastic seal the details, and a torch only comes out for modified bitumen.
- Purlin, batten, and counterbatten framing turn up on older roofs, so we read the substrate before specifying anything new.
- Newark building code sets how decking is attached and how many fasteners each shingle gets, and we build to it.
Materials We Reach For After Hail and Wind
Matching what is already overhead matters more than selling an upgrade. Here is what we keep on hand and when each material earns its place.
- Asphalt shingle comes in three-tab and architectural profiles, and the heavier architectural shingle resists wind uplift far better.
- Wood shake and cedar shake still sit on older Newark roofs and need hand-sealing rather than a nail gun at full speed.
- Slate, clay tile, and concrete tile are heavy and brittle, so we walk them on planks and keep the dumpster off the eave.
- Metal panel, standing-seam panel, and corrugated panel show up on commercial rooftops near McCarter Highway and Route 21.
- Flat sections take TPO, EPDM, or PVC membrane; a built-up roof with modified bitumen works when the substrate is sound.
- Roofing felt, tar paper, and synthetic underlayment sit under the field course, and old felt tells us the roof is at end-of-life wear.
- A reflective roof coating over tired modified bitumen buys a few seasons when replacement is not in the budget.
What a Roof Inspection Actually Turns Up
A rapid roof inspection is not a walk-around with a clipboard. We get on the roof, probe soft spots, and photograph every failure so your claim file holds real evidence.
- Pipe flashing and vent boot collars crack from UV years before the shingle around them wears out.
- A skylight or dormer curb is where slow leaks begin, and mastic smeared over the joint hides the crack instead of fixing it.
- Ridge vent paired with a soffit vent keeps the attic breathing; when either clogs, insulation and roof deck stay wet.
- On a mansard, gambrel, or steep gable, the rake and verge lose shingles before the field does.
- Parapet walls, scuppers, and coping pond water on flat rooftops and push it into the joist ends.
- Hip ends and deep overhangs take wind from two directions, so they get checked twice.
- Ice dam damage at the eave, granule loss in the valley, and a sagging gutter all point to water that has been wicking for years.
Newark Weather That Drives the Work
Newark sits in a classic ice dam climate, and freeze-thaw cycles push meltwater under the shingle and into ceilings near top-floor exterior walls.
The city sees roughly 46 to 50 inches of precipitation in a normal year and 26 to 29 inches of snow, with individual nor'easters dropping a foot in a single night.
Hurricane Sandy in October 2012 brought coastal flooding to eastern Essex County. That history is why we install ice-and-water shield at every eave and snow guards above walkways.
Timelines, Cost, and Insurance Claims
Storm damage repair runs one day for a tarp and a patched slope, and two to four days when decking, flashing, and gutters all need replacement.
- A roof estimate moves with roof pitch, access, and whether shingles can be color-matched or the whole plane gets recovered.
- Insurance claim assistance means Xactimate documentation, a line-item estimate, and adjuster inspection coordination on your behalf, not a folder of blurry phone photos.
- If the first scope comes back short, we file a supplemental claim with dated evidence before the claim deadline closes at your policy's cut-off.
- Waterproofing details, from drip edge to boot flashing, decide whether the repair holds or fails in two winters.



